Leachate treatment for sanitary landfills
Design, build and upgrade.

Scope of work
Thirty years of leachate work
Collection and pumping
Pumps, floaters, pipelines.
Biological treatment
Aerated lagoons and RAS systems.
Dissolved air flotation
DAF units up to 40 m³/h.
Sludge dewatering
Decanters and screw presses.
Controls and electrical
SCADA and electrical boards.
Landfill works
Cells and gas extraction.
Process
The leachate train
Collection
Leachate drained from the cells and pumped to the plant.
Equalisation
Flows and strength evened out before treatment.
Aeration
Aerators drive biological breakdown in lined lagoons.
Flotation
DAF strips suspended solids and residual organics.
Dewatering
Decanters and presses turn sludge into cake.
Discharge and monitoring
Treated effluent tested against the discharge limits.
From our sites
Leachate and landfill projects




-
Completed 2024Leachate treatment for a new environmental park, from collection and equalisation through aerated basins, chemical dosing and clarification to sludge handling.
- Client
- Florida Enviro Corporation
- Consultant
- A.C. Ong Consulting Inc.
- Location
- Floridablanca, Pampanga, Philippines
- Value
- RM 14,392,300.00
- Type
- Leachate, landfill and waste
Proposed Construction of Floridablanca Enviro Park Phase 1 at Lots 85, 124 & 336 at Barangay Pabanlag, Floridablanca, Pampanga, Philippines
-
Completed 2023- Client
- KUB-Berjaya Enviro Sdn Bhd
- Consultant
- C.H. Chuah Perunding
- Location
- Bukit Tagar, Bestari Jaya, Selangor
- Value
- RM 9,895,857.18
- Type
- Leachate, landfill and waste
Proposed Development of Building & Infrastructure Works for Sustainable Scheduled Waste Treatment Center (SSWTC)
-
Completed 2023Influent and effluent pumping, HDPE and stainless steel floaters for sludge suction, submersible stirrers, mobile centrifugal decanter, dissolved air flotation, HDPE sludge pipelines, SCADA controls, electrical boards and remote control stations.
- Client
- KUB-Berjaya Enviro Sdn Bhd
- Consultant
- KUB-Berjaya Enviro Sdn Bhd
- Location
- Bukit Tagar, Bestari Jaya, Selangor
- Value
- RM 7,160,908.00
- Type
- Leachate, landfill and waste
Upgrading and Refurbishment of Leachate Treatment Plant
-
Completed 2018
- Client
- KUB-Berjaya Enviro Sdn Bhd
- Consultant
- Ataseri Konsult Sdn Bhd
- Location
- Mukim Sungai Tinggi, Hulu Selangor
- Value
- RM 5,704,000.00
- Type
- Leachate, landfill and waste
Cadangan Membina dan Menyiapkan Pusat Pelupusan Sisa Pepejal Sanitari di atas Lot 25, 26, 36 dan 37, Fasa 3 Mukim Sungai Tinggi, Daerah Hulu Selangor
-
Completed 2015Multi-disc screw press, primary and secondary dissolved air flotation, surface aerators, main switchboard and self-priming pumps.
- Client
- Ministry of Housing and Local Government (KPKT)
- Main contractor
- AAY Construction Sdn Bhd
- Location
- Melaka Tengah, Melaka
- Value
- RM 4,312,000.00
- Type
- Leachate, landfill and waste
Cadangan Projek Pembinaan Tapak Pelupusan Sisa Pepejal Sanitari di Sg. Udang, Mukim Melaka Tengah, Melaka
-
Completed 2017- Client
- National Solid Waste Management Department (JPSPN), KPKT
- Consultant
- IK Konsult Sdn Bhd
- Main contractor
- AAY Construction Sdn Bhd
- Location
- Titi Tinggi, Perlis
- Value
- RM 2,618,000.00
- Type
- Leachate, landfill and waste
Cadangan Projek Tapak Pelupusan Sisa Pepejal Sanitari di Rimba Mas, Mukim Titi Tinggi, Perlis
-
Completed 2021
- Client
- KUB-Berjaya Enviro Sdn Bhd
- Consultant
- KUB-Berjaya Enviro Sdn Bhd
- Main contractor
- KUB-Berjaya Enviro Sdn Bhd
- Location
- Bukit Tagar Sanitary Landfill, Selangor
- Value
- RM 1,602,868.00
- Type
- Leachate, landfill and waste
Proposed Construction of Landfill Gas Extraction System at Phase 3, Level 60M (Stage 1), Bukit Tagar Sanitary Landfill
-
Completed 2021
- Client
- East Klang Valley Expressway (EKVE)
- Location
- Klang Valley, Selangor
- Value
- RM 1,328,000.00
- Type
- Leachate, landfill and waste
Mechanical, Electrical & Instrumentation Works for Leachate Treatment Plant
-
Completed 2018
- Client
- KenEp Resources (Asin) Sdn Bhd
- Location
- Papan, Perak
- Value
- RM 1,166,000.00
- Type
- Leachate, landfill and waste
400m3/day Leachate Treatment Plant at Papan Sanitary Landfill
-
Completed 2021
- Client
- Berjaya EnviroParks Sdn Bhd
- Main contractor
- Berjaya EnviroParks Sdn Bhd
- Location
- Bukit Tagar Sanitary Landfill, Selangor
- Value
- RM 642,370.00
- Type
- Leachate, landfill and waste
Proposed Construction of Relocation of Existing 450mm dia. LFG Transfer Pipe near the Newly Constructed West Pond of BEP at Bukit Tagar Sanitary Landfill
-
Completed 2023
- Client
- Berjaya EnviroParks Sdn Bhd
- Location
- Bukit Tagar Sanitary Landfill, Selangor
- Value
- RM 629,550.00
- Type
- Leachate, landfill and waste
Proposed Construction of Relocation of Existing 450MM DIA LFG Transfer Pipe
-
Completed 2018Followed by a design-and-build 40 m³/h DAF system at the same plant.
- Client
- KUB-Berjaya Enviro Sdn Bhd
- Consultant
- Ataseri Konsult Sdn Bhd
- Location
- Bukit Tagar Sanitary Landfill, Selangor
- Value
- RM 307,500.00
- Type
- Leachate, landfill and waste
Supply & Install, Deliver, Test and Commissioning New DAF No 1 to Replace Existing DAF at Bukit Tagar Sanitary Landfill
-
Completed 2019
- Client
- Dia-Chemical Sdn Bhd
- Main contractor
- Dia-Chemical Sdn Bhd
- Location
- Jinjang Utara, Kuala Lumpur
- Value
- RM 160,000.00
- Type
- Leachate, landfill and waste
Upgrading Works at Leachate Treatment Plant, Jinjang Utara by Installing Return Activated Sludge (RAS) System
Questions
Frequently asked
What is landfill leachate and why does it need treatment?
Leachate is the liquid that drains through a landfill. It carries high organic load, ammonia and dissolved metals, so it must be collected and treated before discharge to protect rivers and groundwater.
What leachate treatment does Usaha Pammek build?
Collection and pumping, aerated lagoons with surface and paddlewheel aerators, dissolved air flotation, return activated sludge systems, sludge dewatering with decanters, filter presses and multi-disc screw presses, SCADA controls and the electrical boards behind them.
Which landfills have you worked on?
Bukit Tagar in Selangor, Sungai Udang in Melaka, Rimba Mas in Perlis, Papan in Perak, Jinjang Utara in Kuala Lumpur and Floridablanca in the Philippines.
Which discharge standards are plants designed to?
Plants in Malaysia are designed to the leachate discharge limits under the Environmental Quality (Control of Pollution from Solid Waste Transfer Station and Landfill) Regulations 2009.
Work with us
Running a landfill that needs leachate capacity?
Send the scope. We reply with a programme and a price.